Requirement specification and validation steps are similar to the other processes.
Component Analysis
During this stage try to find the software components need for the implementation once the requirements are specified.
Requirements Modification
Analyze the discovered software components to find out whether it is able to achieve the specified requirements.
System Design with Reuse
The frame work of the system is designed to get the maximum use of discovered components. New software may have to design if the reusable components are not available.
Development and integration
Software that cannot be discovered is developed, and the reusable components are integrated to create the new system. The integration process, may be part of the development process rather than a separate activity.
0 comments:
Post a Comment